Case study · Havas UK
3 Pancras
Square
Building-wide intelligence for measurable performance.
King’s Cross · London
The challenge
Already efficient. Still more to find.
The building had already been optimised and its HVAC set-up limited conventional improvement. Envelo added a practical intelligence layer without replacing the HVAC or BMS.
annual saving at building scale
payback including hardware
fall in Havas UK & Ireland Scope 2 emissions
What changed
Ventilation responded to the building, not a fixed profile.
Live conditionsEnergy, indoor air and occupancy informed each decision.
Continuous adjustmentVentilation reduced or increased as the building needed.
Existing systemsResults were achieved without HVAC or BMS upgrades.
People and performance
Lower energy did not mean poorer indoor conditions.
less high-CO₂ exposure, equal to 82 fewer minutes per meeting room each week.
less overly dry air per week during winter.
Detailed case study
See the evidence behind the results.
Download the full five-page case study for more detail on the challenge, Envelo solution and independently validated building performance outcomes.